North Shore footbridge - Stockton On Tees
Footbridge Wire Rope Infill
Infinity footbridge balustrade wire installation by S3i.
![North Shore Infinity Footbridge North Shore Infinity Footbridge](image/s3i/norhero.jpg)
In 2010, S3i completed the installation of the stainless steel wire rope balustrade infill for the North Shore "Infinity" footbridge in Stockton on Tees.
![Infinity footbridge wire rope infill Infinity Footbridge Wire Rope Infill](image/s3i/north-shore-1.jpg)
An 8mm diameter stainless steel cable was used to span the 200 metre footbridge.
![Wire rope infill installation by S3i Wire Rope infill Installation by S3i](image/s3i/north-shore-2.jpg)
![Stainless steel wire rope infill installation Stainless Steel Wire Rope infill Installation](image/s3i/north-shore-3.jpg)
![Tensioned wire rope infill at North Shore Infinity Footbridge Tensioned Wire Rope infill](image/s3i/north-shore-4.jpg)
![North Shore Infinity footbridge at night North Shore Infinity Footbridge](image/s3i/north-shore-5.jpg)
Information about the Infinity Footbridge
Tag: Footbridge, Stainless Steel Wire, Balustrade, Tensioned, Cable, Installation, North Shore, Infinity Bridge, Stockton on Tees
![Contact Our Technical Team on 01302 752504 Contact Our Technical Team on 01302 752504](image/s3i/team-m-feed.jpg)